Energy Infrastructure · Power & Resilience

Sosa Energy Center

Power150 MW
Energy300 MWh
Duration2 Hours
OwnerEnergy Vault
CODQ2 2027

Project Overview

Growing Grid Resilience

The SOSA Energy Center is Energy Vault's second developed, owned, and operated battery energy storage system.

At 150 MW / 300MWh the utility-scale BESS system will be able to charge and discharge continuously for up to 2 hours improving grid resilience in the Electric Reliability Council of Texas (ERCOT). The project leverages Energy Vault's fully integrated solution stack of hardware, software, and service offerings. SOSA will serve as the third deployment of Energy Vault's third generation B-VAULT™ DC BESS product.

Aerial view of the Sosa Energy Center site in Madison County, Texas

Project Delivery Highlights

What Makes This Project Different

Sosa Energy Center site

65 Jobs

Created during construction.

$100M

Investment in Madison County.

$9.3M

Estimated tax revenue to North Zulch ISD and Madison County over a 10-year period.

FAQ

Frequently Asked Questions

A BESS stores electricity when supply exceeds demand (or when prices are low) and releases electricity when demand increases or supply decreases. This helps balance the grid and reduce reliance on fossil-fuel peaker plants.

As intermittent energy sources increase, the grid requires fast-responding flexible resources to fill power gaps and regulate the grid. The SOSA Energy Center helps stabilize the grid, reduce congestion, and ensure reliable power delivery to homes and businesses across Texas.

Not only does the SOSA Energy Center bring stronger local grid reliability and resilience to Madison County, it also offers economic development, job creation and consistent local revenue streams. SOSA will generate ongoing tax revenue and land lease payments which can support schools, infrastructure and public services — an estimated $9.3M to North Zulch ISD and Madison County over a 10-year period. Energy Vault expects the project to generate over 65 jobs during construction and represent a local investment of $100M in Madison County.

Yes. The SOSA Energy Center is designed to meet or exceed all applicable fire, electrical, and safety standards. The system includes multiple layers of safety, including:

  • Advanced thermal management
  • Fire detection and suppression systems
  • 24/7 remote monitoring
  • Emergency response coordination with local authorities

The SOSA project uses industry-leading BESS technology that has been deployed worldwide, with containerized, outdoor, physically separated units designed to prevent fire propagation. Along with the BESS, Energy Vault uses its very own Energy Management System (EMS) to allow for early detection, rapid isolation, and immediate response.

Learn More

Download the project fact sheet.

In the News

Related Coverage

Press Release

Energy Vault Begins Construction of 150 MW SOSA Energy Center in Texas' ERCOT Market

Business Wire
Article

Energy Vault breaks ground on 150-MW battery in Texas

Renewables Now
Article

Energy Vault begins construction on 150 MW storage project in Texas

PV Magazine
Energy Vault project site

Interested in Energy Vault's Project Delivery Capabilities?

Discuss your project requirements with our team.