Newsroom | Energy Vault

ACEN advances construction of BESS facility in Australia

Written by Energy Vault | Mar 3, 2025 3:45:06 PM

ACEN, through ACEN Australia, has tapped global energy storage specialist Energy Vault to lead the construction of the 400-megawatt-hour BESS project located at the site of the group’s New England Solar.

 

ACEN Australia head of construction and engineering Tim Greenaway, along with Energy Vault chairman and CEO Robert Piconi, recently conducted a site inspection at the battery facility.