Calistoga Resiliency Center (CRC) is the world's largest utility-scale, ultra-long duration energy storage project. This first-of-its-kind hybrid hydrogen + battery energy storage system enables a cost-effective, community-scale, fully carbon-free microgrid that stores and dispatches clean energy, on demand.
Customer: PG&E
Location:
Calistoga, Napa County, California
Products:
H-VAULT™, B-VAULT™, VaultOS™, LTSA
Peak Power Output: 8.5 MW
Energy: 293 MWh
Duration: 48 Hours
Project Status:
Under Construction
Energy Vault's customer-centric approach delivered a bespoke Battery Energy Storage System (BESS) that maximized energy density within a highly space-constrained urban site and met an accelerated project timeline.
Customer:
Wellhead Electric Company, W Power
Location:
Stanton, Orange County, California
Products:
Custom BESS Solution, VaultOS™
Peak Power Output: 68.6 MW
Energy: 275.2 MWh
Project Status: Operating
COD: August 2023
Energy Vault’s custom-tailored Battery Energy Storage System (BESS) solution addresses NV Energy's unique project needs. The Reid Gardner short duration energy storage project improves Nevada's grid resilience and enable excess solar generation to serve demand after the sunsets.
Customer: NV Energy
Location:
Moapa, Nevada
Products:
Custom BESS Solution, VaultOS™, LTSA
Peak Power Output: 220 MW
Energy: 440 MWh
Project Status:
In Operation
COD: December 2023
Energy Vault’s B-VAULT™ AC battery energy storage system (BESS) shifts regional wind and solar generation, stabilizing the Texas grid while increasing customer revenue.
Customer: Jupiter Power
Location:
Fort Stockton, Pecos County, Texas
Products:
B-VAULT™ AC, VaultOS™
Peak Power Output: 100 MW
Energy: 200 MWh
Project Status: Operating
COD: March 2024